Power outage closed

There has been a power outage affecting our server hall. Most running jobs on Pelle and Miarka has been interrupted and failed, Bianca is down. This status will be updated once we know more.

Update 2026-09-29 16:00

There were at least three independent power failures, one at around 10:53 and two at 11:41. The power was just glitching but is was enough to shut down the compute nodes.

Update 2026-09-29 16:30

Pelle and Miarka should be up and running and has been for a while.

Short story: We are working on Bianca but are not done yet.

Long story: The switches for Bianca restarted when the power failed. We have discovered a hardware problem with one of the links from the OpenStack Bianca control plane to the switch but disabling just that link did not help. We believe restarting the whole OpenStack Bianca control plane may help. This has worked before and we are currenly in the process of doing this. This usually takes a couple of hours.

Update 2026-09-30 08:00

Bianca is back in production, late yesterday evening. We have started up the login nodes that were running before the power failure.

Update 2026-09-30 08:30

Dis is not up and running as expected.

Update 2026-09-30 15:00

Dis is back in production. Closing status.